CURRENT
Department of Defense
ICS Security Assessment
Assessed the Industrial Control Infrastructure of 14 critical manufacturing plants owned by the Department of Defense.
RESULTS:
Assessments included auditing ICS Systems such as PLC’s, HMI’s and SCADA system to NIST and CNSSP standards.
DURATION | COMPLETION:
60 months | 2023
SCOPE:
$1.8 million
2020
Texas Municipality
Ignition SCADA Deployment for Water and Wastewater Support
Transitioned outdated HMIs to a new SCADA solution for water, wastewater and power generation of a medium size city. Integrated all fresh and wastewater plants, lift stations, wells, storage, and critical power generation sites for city hall, police, fire, emergency management, and utilities departments. Integrated solution into the City’s Emergency Operations Center (EOC).
RESULTS:
Assessments included auditing ICS Systems such as PLC’s, HMI’s and SCADA system to NIST and CNSSP standards.
DURATION:
12 months
SCOPE:
$385,000
US Department of Energy
SD2-C2M2
Supported the development of a new maturity model assessment methodology for the secure design and development of software used in critical Industrial Control Systems.
RESULTS:
RTI used the results to perform the first assessment against the world’s largest OEM and their Energy Management System division. Commercialization of the product is currently being funded.
DURATION:
12 months
SCOPE:
$385,000
2019
Large Oil & Gas Company
Cybersecurity Operations Implementation
Designed networking solution to integrate 72 remote sites into a central location for monitoring and control. Evaluated and specified equipment and SD-WAN solutions to best fit the technical requirements of the operation maintaining secure transmission. Provided network operations and security monitoring support.
DURATION:
16 months
SCOPE:
$2.1 million
Medium Oil & Gas Company
OT Security Team Augmentation
Red Trident provided application, database, and automation specialists to an OT Security team that provide 24/7/365 support for a large shale play in North Dakota.
DURATION:
26 months
SCOPE:
$2.3 million
Large Hazardous Waste Reclamation Facility
Facility Expansion Project
Engineer, procure, and construct (EPC) project to double facility size and capability. Identified and procured all material, software, and equipment. Built master industrial cabinet at RTI location to reduce facility downtime.
DURATION:
18 months
SCOPE:
$230,000
NASA
Switchgear Maintenance
Red Trident provided critical emergency maintenance services for 40 medium voltage electrical switchgear devices for JSC campus buildings during nights, weekends, and holidays to support NASA and its mission.
RESULTS:
Assessments included auditing ICS Systems such as PLCs, HMIs and SCADA system to NIST and CNSSP standards.
DURATION:
36+ months | 2019
SCOPE:
$365,000
NASA
Mission Control UPS System
Supported the design and engineering of the final Emergency Power System for Mission Control at Johnson Space Center, Houston, TX.
RESULTS:
Our design and implementation, comprised of twin 1200kVA system with a Static Auto Tie exceeded NASA performance specifications by leveraging new IGBT technology and Lithium batteries. Completed on time and under budget.
DURATION:
12 months | 2019
SCOPE:
$2.2 million
Large Hazardous Waste Reclamation Facility
GE Simplicity upgrade and conversion to RX3i Project
Performed full life cycle implementation of major software upgrade. Converted all logic, tags, and graphics and re-engineered automation functionality. Conducted functionality testing and loop checks. Identified standardized format and created template for future upgrade projects.
DURATION:
8 months | 2019
SCOPE:
$138,000
2018
Large Oil & Gas Company
OT Security Team Augmentation
Successfully planned, implemented, and operated Cybersecurity Department for $3B annual company.
RESULTS:
The new CS Department was responsible for corporate and remote users, remote sites, data centers, and hundreds of applications to a security and monitoring suite in the cloud.
DURATION:
26 months
SCOPE:
$1.8 million
Texas Municipality
Lift Station Automation for Water and Wastewater Support
Secure automation design, implementation and modernization for Municipality wastewater treatment systems using wireless technologies and PLC automation to provide remote monitoring and control of lift stations.
DURATION:
18 months
SCOPE:
$230,000
Medium Oil & Gas Company
Remote Monitoring and Maintenance Support
Provided 24/7/365 cybersecurity monitoring and maintenance response for two refineries. Installed and tuned SIEM solution and supported automation, networking, and infrastructure environments during scheduled and unscheduled maintenance.
DURATION:
28 months | 2018
SCOPE:
$2.3 million