Red Trident has completed over 240 OT Cybersecurity projects since 2014. Below is a sampling of some of our past performance.
Red Trident Projects
Transportation – Rail
OT Cybersecurity Assessment
Support the analysis of a metro rail customer including vulnerability analysis of the rail car, station systems, and network infrastructure. Provided a risk analysis of each system and a risk analysis of the system of systems with a focus on safety and operational impact.
DURATION:
4 months
SCOPE:
$85,000
Manufacturing
OT Cybersecurity Assessment
Completed a cybersecurity assessment of 12 manufacturing plants. Walked down each facilities OT networks, reviewed network configurations to determine vlan segments that included OT equipment, developed a full OT asset inventory of all systems connected to the network as well as ones that were not. Provided a detailed report per site and as an organization of remediating risk in a practical manner.
DURATION:
5 months
SCOPE:
$335,000
Large Power Entity
NERC CIP Medium Assessment
Reviewed the existing policies and procedures regarding Medium Impact requirements to determine gaps between their existing program and NERC CIP v5. After gaps were identified, we were asked to support in the modification of the program to meet v5 requirements and establish new procedures for a new facility to ensure it meets Medium Impact requirements.
DURATION:
3 months
SCOPE:
$38,000
Department of Defense
FRCS Cybersecurity Support
Acting as the OT Cybersecurity Subject Matter Experts in support of a large foreign naval base upgrade. Producing all deliverables in compliance with UFGS 25 05 11.
DURATION:
12 months
SCOPE:
$560,000
Large City
Water & Wastewater OT Cybersecurity Assessment
Performed a network and vulnerability assessment across 14 large water and waster water facilities. Developed complete network documentation of all OT systems and connection both internal to the facilities and external connections discovered between plants.
DURATION:
8 months
SCOPE:
$265,000
Large LNG Terminal
OT Cybersecurity Support
Provide a wide array of OT cybersecurity support services from network design assessments, OT Cybersecurity program development to USCG, FERC, and DHS requirements, and supported the Risk Assessment of several systems.
DURATION:
24 months
SCOPE:
$480,000
Medium Oil & Gas
Network Security Assessment and Redesign
We assessed 3 major fields for an upstream oil and gas operator. The project entailed collecting and analyzing the entire wired and wireless field infrastructure including LAN/WAN switch and pump jack controllers, P2P and P2MP radio networks and demarcation points for the field.
RESULTS:
Assess included the complete asset inventory of each of the fields, the network configuration and routing of the field, and recommendations of where and what security controls can be deployed to enhance visibility and manage risk.
DURATION:
4 months
SCOPE:
$95,000
Department of Defense
ICS Security Assessment
Assessed the Industrial Control Infrastructure of 14 critical manufacturing plants owned by the Department of Defense.
RESULTS:
Assessments included auditing ICS Systems such as PLC’s, HMI’s and SCADA system to NIST and CNSSP standards.
DURATION:
60 months
SCOPE:
$1.8 million
US Department of Energy
SD2-C2M2
Supported the development of a new maturity model assessment methodology for the secure design and development of software used in critical Industrial Control Systems.
RESULTS:
RTI used the results to perform the first assessment against the world’s largest OEM and their Energy Management System division. Commercialization of the product is currently being funded.
DURATION:
12 months
SCOPE:
$385,000
Large Oil & Gas Company
Cybersecurity Operations Implementation
Designed networking solution to integrate 72 remote sites into a central location for monitoring and control. Evaluated and specified equipment and SD-WAN solutions to best fit the technical requirements of the operation maintaining secure transmission. Provided network operations and security monitoring support.
DURATION:
16 months
SCOPE:
$2.1 million
Medium Oil & Gas Company
OT Security Team Augmentation
Red Trident provided application, database, and automation specialists to an OT Security team that provide 24/7/365 support for a large shale play in North Dakota.
DURATION:
26 months
SCOPE:
$2.3 million
NASA
Mission Control UPS System
Supported the design and engineering of the final Emergency Power System for Mission Control at Johnson Space Center, Houston, TX.
RESULTS:
Our design and implementation, comprised of twin 1200kVA system with a Static Auto Tie exceeded NASA performance specifications by leveraging new IGBT technology and Lithium batteries. Completed on time and under budget.
DURATION:
12 months
SCOPE:
$2.2 million
Large Hazardous Waste Reclamation Facility
GE Simplicity upgrade and conversion to RX3i Project
Performed full life cycle implementation of major software upgrade. Converted all logic, tags, and graphics and re-engineered automation functionality. Conducted functionality testing and loop checks. Identified standardized format and created template for future upgrade projects.
DURATION:
8 months
SCOPE:
$138,000
Large Oil & Gas Company
OT Security Team Augmentation
Successfully planned, implemented, and operated Cybersecurity Department for $3B annual company.
RESULTS:
The new CS Department was responsible for corporate and remote users, remote sites, data centers, and hundreds of applications to a security and monitoring suite in the cloud.
DURATION:
26 months
SCOPE:
$1.8 million
Texas Municipality
Lift Station Automation for Water and Wastewater Support
Secure automation design, implementation and modernization for Municipality wastewater treatment systems using wireless technologies and PLC automation to provide remote monitoring and control of lift stations.
DURATION:
18 months
SCOPE:
$230,000
Medium Oil & Gas Company
Remote Monitoring and Maintenance Support
Provided 24/7/365 cybersecurity monitoring and maintenance response for two refineries. Installed and tuned SIEM solution and supported automation, networking, and infrastructure environments during scheduled and unscheduled maintenance.
DURATION:
28 months
SCOPE:
$2.3 million